Funding call EDIP EU

EDIP/USI 2027: Industrial Reinforcement Actions for unmanned and counter-unmanned systems (EU–Ukraine)

Reference EDF-EDIP-USI-2027-LS-IRA-CUXS
European Commission, DG DEFIS Call opens

At a glance

Instrument
Funding call
Application route
consortium
Consortium
required

Eligibility

Consortium of max 15 legal entities; eligible countries and ownership/control conditions per call document; actions must deliver production capacity in Ukraine under Regulation (EU) 2025/2643

Why it matters

This is production-capacity money, not R&D: it pays to stand up joint EU–Ukraine lines, MaaS small-batch capacity and heavy-industry conversion for attritable drones and C-UAS, with KPIs on units/month and lead time. Relevant to FPV/interceptor drone makers, fibre-optic and RF-denied control specialists, C-UAS sensor/jammer suppliers and contract manufacturers with or seeking a Ukrainian industrial partner.

Do this:

Line up a Ukrainian manufacturing partner and a consortium of ≤15 entities now, and build a proposal with baselined production KPIs (units/month, time-to-rate, lead-time cut) plus the optional EUR 200k protection WP, for submission on the EU Funding & Tenders Portal before 16 February 2027.

Summary

DG DEFIS call under the Ukraine Support Instrument (Regulation (EU) 2025/2643) funding Industrial Reinforcement Actions to scale cross-border EU–Ukraine production of (swarming) UxS including FPV and interceptor variants, EW-resilient/fibre-optic and GNSS-denied UxS, and counter-UxS/EW supporting systems (detection, jamming/spoofing, spectrum management, optronic and radar guidance). Total budget EUR 80m, max EUR 10m EU contribution per project, minimum action size EUR 2m, consortia capped at 15 entities. Optional work package (max EUR 200k) for physical and cyber protection of the production capacity; actions run 3–5 years, ending by 31 December 2033. Deadline 16 February 2027.

Dates in this notice

  1. Call opens
  2. Application deadline

Organisations in this notice

This noticeFunding callEDF-EDIP-USI-2027-LS-IRA-CUXS

Source & methodology

Source: EU Funding & Tenders Portal © European Union.

AI-extracted summary (claude-opus-5). confidence 90%.

Source text (original language, not translated)
Expected Impact:
Projects are expected to deliver results aligned with the expected results set out in this call topic and to evidence their contribution through dedicated KPIs defined in the proposal. Expected results include:
• demonstrable and sustainable
increase in production capacity in UA
for the targeted (counter-)UxS-related production lines;
• measurable
reduction of production lead time
from order/production decision to delivery in UA;
• improved t
imely availability and supply of defence products in UA
, including increased delivery reliability and readiness of production lines;
• effective
cross-border cooperation between UA and EU
that enables production ramp-up, integration, qualification and sustainment;
• strengthened Ukrainian industrial base, and, where applicable, operationalised MaaS and dual-use heavy industry conversion pathways for surge.
Proposals shall define, baseline and track KPIs such as: production output (units/month), time-to-rate, lead-time reduction, line availability/uptime, qualified output delivered in UA, MaaS throughput, surge conversion readiness indicators, and workforce trained where relevant—alongside risk-related indicators demonstrating supply robustness and maintainability readiness.
Objective:
This topic aims to reinforce (counter-)UxSs readiness and a sovereign UxSs component base by enabling the rapid industrial reinforcement of Member States and Ukraine for key defence product (including subcomponents) production lines:
•
(swarming) UxSs
(including FPV variants, modular payload configurations, relay/repeater variants, and AI-enabled/autonomy-enabled UxS integration where relevant) and (swarming) UxS interceptor variants (including intercept solutions to protect critical nodes and logistics routes);
•
EW-resilient UxS variants
(including fibre-optic controlled UxS, and other GNSS- /RF-denied operational profiles);
•
counter-UxSs and EW(-resilient) supporting systems
(including counter-UxSs EW function supporting detection/characterisation, jamming/spoofing and spectrum management for friendly UxS operations, terminal navigation, optronic and radar-guided systems).
Actions shall be aligned with the objectives, scope and priorities of this call topic, and implemented as IRA under USI in line with Regulation (EU) 2025/2643. Proposals are expected to ensure
timely availability and supply of defence products in Ukraine,
by scaling production capacity and industrial readiness for
cross-border (EU-UA)
industrial set-up in the form of:
• joint production lines;
• reinforcement of specific production capacity and enablement capacity (including integration and validation/testing of alternative control and navigation approaches, production/service and maintenance capability/integration of sensing and effector modules, multi-sensor fusion integration, and dedicated assembly/test capacity/production planning to sustain high monthly volumes, as applicable);
• scale-up of UA systems and ready-to-use production lines (including rapid-cycle modular assembly and re-configuration capacity to adapt to fast-evolving threats and mission profiles);
• MaaS (Manufacturing as a Service) (including rapid small-batch production, fast line changeover, and scalable assembly/test capacity for attritable UxS output);
• dual-use heavy industry conversion options for defence surge (including surge assembly/integration, test, packaging, and supporting infrastructure as applicable).
Applicants may include an optional dedicated Work Package (WP) implementing a supporting action as defined in Article 13(d) of Regulation (EU) 2025/2643, to r
einforce the physical and cyber protection of the production capacity targeted by the action, including on security against UxS/drone-enabled threats
. The objective is to reduce the risk of disruption, sabotage or interference affecting production continuity, ramp-up and deliveries, complementing the proposal’s overall risk-management approach (notably safety, supply-chain and obsolescence, industrialisation/integration, and maintainability risks) and supporting the achievement of the industrial KPIs set for lead time and capacity.
Scope:
Proposals shall implement Industrial Reinforcement Actions, in line with Regulation (EU) 2025/2643, targeting the specific defence product and production capacities listed under “Objectives pursued”.
Proposals shall demonstrate the
criticality of the targeted defence product (including subcomponents)
and justify the urgency of reinforcing their availability and security of supply through the proposed industrial reinforcement activities.
Proposals shall include a
risk-management approach
commensurate with industrial ramp-up in UA (including safety, supply-chain and obsolescence, industrialisation/integration, maintainability, and operational constraints), explain how risks are mitigated to ensure timely availability and supply of defence products in UA, and shall, where relevant include provisions allowing to upgrade quickly the targeted (counter-)UxS based on the evolving lessons identified from the battlefield.
Activities linked to the
physical and cyber protection WP
may include expert threat assessment, procurement, installation and initial integration of proportionate solutions as well as efforts to connect to a national or European security system for: (i) counter-UxS site protection measures (detection/alerting and other authorised protective measures), and/or (ii) cyber protection measures of production-relevant networks and systems (including monitoring, hardening and secure access) which includes obtaining the European Union Cybersecurity Certification (EUCC) schemes for products used in the IRA activity, as well as acceptance testing and operational set-up necessary for effective deployment, in order to work towards compliance with the NIS2 Directive, where applicable, and alignment with standards such as ISO/IEC 27001 and IEC 62443.
Actions shall not have started before 5 March 2024 and shall not have been completed before the signature of the Grant Agreement (GA). The duration and the starting date of the action will be set out in the GA. The action shall have an indicative duration of three to five years; in any event, it shall be completed no later than 31 December 2033.
Budget
The Commission is considering a total budget of EUR 80 000 000 for the call for proposals.
The maximum EU contribution per funded project will not exceed EUR 10 000 000
allowing several proposals to be funded.
Depending on the number and quality of received proposals and the requested Union financial contributions, the Commission may decide to reallocate budget between calls.
The Commission is considering supporting specifically any optional work packages dedicated to the reinforcement of the physical and cyber protection of the industrial capacity targeted by the action, with a maximum EU contribution of EUR 200 000 per funded project.
Minimum financial size of the actions
The minimum financial size of the action to be eligible for funding is EUR 2 000 000.
Maximum number of legal entities forming part of the consortium
The number of legal entities forming part of the consortium shall not exceed 15 as per Article 34(3)(c) of the Regulation (EU) 2025/2643.

Conditions:
Conditions
1. Admissibility conditions: Proposal page limit and layout
described in section 5 of the
call document
.
Proposal page limits and layout:
described in Part B of the Application Form available in the Submission System.
2. Eligible countries
described in section 6 of the
call document
.
3. Other eligibility conditions
described in section 6 of the
call document
.
4. Financial and operational capacity and exclusion
described in section 7 of the
call document
.
5a. Evaluation and award: Submission and evaluation processes
described section 8 of the
call document
and the
Online Manual
.
5b. Evaluation and award: Award criteria, scoring and thresholds
described in section 9 of the
call document
.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in section 4 of the
call document
.
6. Legal and financial set-up of the grants
described in section 10 of the
call document
.
Call document and annexes:
Call document
Application form templates
Application Form (EDIP and USI)
Detailed Budget Table (USI LS)
Participant Info (EDIP and USI)
List of Infrastructure, facilities, assets and resources (EDIP and USI)
Ownership Control Declaration
Procurement Strategy (EDIP and USI)
Model Grant Agreements (MGA)
EDF, ASAP, EDIRPA, EDIP and USI Lump Sum MGA
Additional documents:
EDIP Work Programme
EDIP Regulation 2025/2643
EU Financial Regulation 2024/2509
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement