Tender · Norway
2026008656 Framework agreement for the procurement of diving rates
FORSVARSMATERIELL · published 10 Jul 2026 · auto-extracted, not yet reviewed · Source ↗
Deadline24 Aug 2026 6 days left
Budget / value—
Statusopen
CPV37412200
Summary
The aim of the procurement is to enter into a framework agreement with a supplier of diving equipment to cover the users ́needs. The system shall mainly be used for SCUBA diving and light work diving. The material will be used in sea, lake and rivers. The material shall be used by personnel who have sufficient competence in diving. The material will also be used before and after diving, such as lo
Source text (raw, may be non-English)
The aim of the procurement is to enter into a framework agreement with a supplier of diving equipment to cover the users ́needs. The system shall mainly be used for SCUBA diving and light work diving. The material will be used in sea, lake and rivers. The material shall be used by personnel who have sufficient competence in diving. The material will also be used before and after diving, such as loading/unloading and connecting diving material- surface protection such as boatmen and diving managers- wading (beach/river width) - work on the quay/vessel.
Related
Tender
· Spain
· deadline 14 Sep 2026 (27d)
· €150k
Acuerdo Marco para el Mantenimiento de los espacios de máquinas y colectores de refrigeración de los BAM de Canarias del Mando Naval de Canarias.
Award
· Portugal
· €4.5m
A mid-size civil/dual-use underwater robotics buy in an Atlantic region, won by a Spanish integrator rather than a Portuguese or northern-European ROV house — a reference point for UUV/ROV makers on who is winning Iberian research-vessel work. Relevant to ROV/UUV builders and subsea sensor, tether, manipulator and control-software suppliers. Do: If you supply subsea sensors, manipulators, tethers or ROV control software, approach OMIL & GONZALEZ SL as integrator for the Azores research-vessel ROV module build.
Tender
· Romania
· deadline 31 Aug 2026 (13d)
· €5.9m
NATO-funded naval infrastructure works at Constanța signalling continued Black Sea basing build-out; relevant to construction and MEP contractors with Romanian presence and NSIP experience. Do: If you are a works contractor with Romanian entity and NSIP references, download the documentation on e-licitatie.ro (SEAP) and submit by 31 August 2026; clarifications must be requested at least 20 days before that deadline.
Award
· Spain
· €40k
JEMAN.- Hesperides.- SAR. Equipos de salvamento y seguridad interior. 2018AR029S
Tender
· Netherlands
· deadline 16 Sep 2026 (29d)
· €1.2m
Small but specific naval aviation deck-equipment buy by the Dutch MoD, typically supplied by a handful of helicopter handling/securing system makers. Relevant to SME suppliers of shipborne helicopter handling, deck locking and landing grid hardware with FAT/HAT/SAT qualification experience. Do: If you build shipborne helicopter landing/securing grids, download the tender pack via TED notice 562377-2026 and submit to the Dutch MoD by 16 September 2026 with qualification and installation-support references.
Award
· Spain
· €29.7m
MBDA España remains the incumbent for Spanish naval point-defence missile systems, so entry is via its Spanish supply chain rather than direct bids. Relevant to seeker, launcher, RF/EO sensor and fire-control subsystem makers with a Spanish footprint. Do: Contact MBDA España's Madrid procurement/supply-chain team about subsystem or integration work packages on this three-system Navy delivery.
Source: Tenders Electronic Daily © European Union, reused under EU open data policy. Notice 476081-2026. Enrichment: heuristic (confidence 40%).