|
AwardGermany
Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr
Supply of lashing chains under TL 4010-0017 and supply number 4010-12-376-3685, among others, as furnished items (Beistellung) for the already concluded contract on manufacture and delivery of the series Rüstsatz Netzservicetrupp (RS NServTrp) Q/I2BK/R8903.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The contract covers the supply of various spare parts for the SPz Puma. Each supply number forms a separate lot, with three individual lots in total.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The contract covers the factory overhaul of accessory boxes for the GTK Boxer system.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The framework covers the factory overhaul (Werksinstandsetzung) of gearboxes and distributors for the TPz 1 Fuchs system, divided into lots with estimated demand plus a safety surcharge.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Procurement of bottle baskets for Tecniplast drinking bottles and matching heavy-duty transport trolleys, made of glass-fibre reinforced PPA by BC-Plast, for laboratory animal housing.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Marinearsenal DO Wilhelmshaven
Post-deployment inspection (EnPI 2026 NRW) and maintenance work on the Frigate Class 125 NORDRHEIN-WESTFALEN, covering shipbuilding, propulsion, electrical systems, inspections of pressure vessels and fire-extinguishing systems, lifting equipment checks, and support services such as container provision, waste disposal, cleaning and security.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The framework agreement covers repair services for Bundeswehr motorboats (MPO / supply number 194011030 - 1940-12-193-3315 - MOTORBOOT 3) at maintenance levels 2/3 from 01.01.2027 to 31.12.2031.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Bundesamt für Bauwesen und Raumordnung, in Vertretung des Bundesministerium der Verteidigung
The tender covers civil engineering and pipework works in the building services (TGA) external installations area for the new staff building of the Planning Office at Julius-Leber-Kaserne, Kurt Schumacher Damm 41, 13405 Berlin.
|
Published |
Deadline |
Budget / value€749k |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The framework covers factory overhaul of cooling condensers for the TPz 1 Fuchs system, across specialist lots with total quantities of 124, 61, 36 and 27 units.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
Framework agreement for the factory overhaul of brake caliper assemblies for the GTK Boxer system, with a total quantity of 409 units (estimated requirement plus safety surcharge, which caps orders).
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Bundesamt für Ausrüstung, Informationstechnik und Nutzung
The Federal Office of Bundeswehr Equipment, Information Technology and In-Service Support (BAAINBw) is procuring spare parts for GTF: 35 EA driven vehicle axles, 45 EA hydraulic vehicle transmissions and 50 EA distributor gearboxes, with VN numbers 2520 12 377 3249, 2520 12 3773252 and 2520 12 377 4521.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The framework agreement covers the factory overhaul of diesel engines for the Leopard 2 main battle tank system, across four lots with total quantities of 92, 45, 12 and 6 units.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The contract covers the plant overhaul of planetary gearboxes for the SPz Marder system.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The contract covers the factory overhaul of brake assemblies for the TPz 1 Fuchs system.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr
Manufacture and delivery of up to 450 SE mobIH 2/3, including accessories, equipment and documentation, is planned under a seven-year framework agreement with one company. Expected firm orders cover up to 43 SE and call-off orders up to 407 SE.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr
BAAINBw is procuring pneumatic vehicle tyres under framework agreement 6002885350-BAAINBw E2.1. The notice text lists only the category "Reifen, Luft, Fahrzeug" (tyres, air, vehicle) and states no further conditions.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The contract covers the works overhaul (Werksinstandsetzung) of valve assemblies for the TPz 1 Fuchs system, split into specialist lots with total quantities of 292, 144, 260, 128, 124, 61, 174 and 86 pieces.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
Prior noticeGermany
Deutsche Raumfahrtagentur im Deutschen Zentrum für Luft- und Raumfahrt e.V.
This is a non-binding request for information, not a procurement procedure, serving only as market research analogous to § 28 VgV.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Zentrale Polizeidirektion Niedersachsen
A framework agreement for the supply of approximately 170 Nokia IP-MPLS routers over the contract term, including technical consulting, manufacturer support, all features and usage rights, and free provision of future software for all devices.
|
Published |
Deadline |
Budget / value€1.2m |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
A framework agreement for the factory overhaul of ALLISON GETR 4800SP* and automatic transmissions for the GTK Boxer system.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr
The BAAINBw notice concerns spare parts packages for the E2.2H corvette, including measuring devices and control units. The text provides no value, deadline or lot details.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The framework agreement covers exercise support abroad for the Fennek JFST / 1A2 system at maintenance levels 2 and 3, for the period 01.08.2025 to 31.07.2028, across eleven NSNs.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Planungsamt der Bundeswehr Referat I 1 (4)
The Army Development Office (Amt für Heeresentwicklung) is testing a hyperspectral sensor system to assess its basic suitability and current technology readiness for detecting targets concealed by modern multispectral deception and camouflage systems, and to evaluate tactical-operational added value and achievable reconnaissance range.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Bundesrepublik Deutschland vertreten durch das Staatliche Baumanagement Niedersachsen
Planning services under § 55 HOAI for plant groups 2, 4, 5 and 8 to renew the central heat supply (pellet boiler) at Immelmann Barracks, Celle.
|
Published |
Deadline |
Budget / value€425k |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The contract covers implementation of a production planning tool for capacity-oriented planning and control, namely an Advanced Planning and Scheduling (APS) system with finite resource planning linked to SAP S/4HANA in near real time.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Bundesrepublik Deutschland vertreten durch das Staatliche Baumanagement Niedersachsen
The contract covers the establishment and maintenance of a construction site facility for a four-storey office building on federal property in Wilhelmshaven. All timber products used must demonstrably originate from sustainable forest management.
|
Published |
Deadline |
Budget / value€367k |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The contract covers upgrade, modernisation and maintenance services (IHS 4) for engine assemblies of the Leopard 2 main battle tank system and its family.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Bundesamt für Infrastruktur, Umweltschutz und Dienstleistungen der Bundeswehr
Procurement of hook-lift trucks with crane body and skip-loader vehicles for roll-off containers, transport trailers for roll-off containers, roll-off tipping skips, and roll-off flatbed/tipping skip units with tarpaulin and lift.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The contract covers the factory overhaul (Werksinstandsetzung) of various assemblies of the BeobAufklAusstattung BAA Fennek system.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Marinearsenal Warnowwerft
The Naval Arsenal plans the scheduled overhaul of the fleet supply ship Class 702 FRANKFURT AM MAIN at the Rostock duty station (Warnowwerft site) as in-house maintenance, acting as main contractor and providing skilled staff and infrastructure including the dock.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
The contract covers planned repair and overhaul (Instandsetzung) of the MzB class 748 vessel Helmsand, including dry-docking, cleaning and preservation of the hull above and below the waterline, cleaning of bunkers, tanks and cells, maintenance of EDiMot units, repair of ship-operating systems and fittings, and disinfection of the drinking water system.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
go.Rheinland GmbH
Procurement for the creation of a booking and access system (overall system including achieving operational readiness) for lockable bicycle parking facilities, such as collective bicycle parking facilities and bicycle boxes, in the association areas of go.Rheinland and NWL, radbox.nrw.
|
Published |
Deadline |
Budget / value€92k |
|
|
AwardGermany
Landesbetrieb Bau- und Liegenschaftsmanagement Sachsen-Anhalt (BLSA)
Roofing works for the new GNUE maintenance hall HIL at the Sachsen-Anhalt Barracks in Weißenfels, reference SHB 532-25, with details in Lot 0001.
|
Published |
Deadline |
Budget / value€284k |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The contract covers the factory overhaul of various heater assemblies of the GTK Boxer system.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Marinearsenal Warnowwerft
The Naval Arsenal plans the scheduled maintenance of the task group supply ship Class 702 FRANKFURT AM MAIN at Rostock (Warnowwerft site) as in-house repair, with the Naval Arsenal acting as main contractor and providing skilled staff and infrastructure, including the dock.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Landesbetrieb Bau- und Liegenschaftsmanagement Sachsen-Anhalt (BLSA)
Site clearance and infrastructure works for the new HIL maintenance hall at the Sachsen-Anhalt barracks in Weißenfels, under Lot 0001 (reference SHB 696-24).
|
Published |
Deadline |
Budget / value€1.8m |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
The framework agreement covers repair of the Enok 6.1 system at maintenance level 4 (NSNs 123819278, 124070421, 124099039, 124099040) for 01.06.2026 to 31.05.2028.
|
Published |
Deadline |
Budget / value€890k |
|
|
AwardGermany
Staatl. Hochbauamt Ulm
The Staatliche Hochbauamt Ulm is procuring transport infrastructure planning services (Objektplanung Verkehrsanlagen) under HOAI through a multi-partner framework agreement with 3 contractors, covering federal construction projects at sites including the Bundeswehrkrankenhaus Ulm, Rommelkaserne Dornstadt, Flugplatz Laupheim and several THW locations.
|
Published |
Deadline |
Budget / valueNot stated |
|
|
AwardGermany
Landesbetrieb Bau- und Liegenschaftsmanagement Sachsen-Anhalt (BLSA)
The contract covers repair of the siding track at Letzlingen, ÜbPl Altmark Gardelegen, under Lot 0001 Track construction works.
|
Published |
Deadline |
Budget / value€6.2m |
|
|
AwardGermany
HIL Heeresinstandsetzungslogistik GmbH
HIL GmbH is considering a contract for the supply of 55 EA Mercedes-Benz diagnostic software licences, “XENTRY Diagnosis”, for the maintenance of already migrated G-Class-based vehicles (LKW gl leicht “Wolf”, LKW gl leicht geschützt “Wolf SSA” and LAPV GGF1 “Enok”) and of G-Class-based vehicles planned for migration (LKW mil gl leicht “Wolf 2” and EinsSys LLPlattf “Caracal”).
|
Published |
Deadline |
Budget / value€552k |
|